Tuesday, 28 June 2011

WEEK 14 ROOF FRAME BRACING

Z Nail

strap nail

[ nail

[ nail

diagonal strap brace

CT-200 bracing

uplift strap over lintel

Tuesday, 21 June 2011

WEEK 13 ROOF FRAMING

double top plate jion

 Use a string line and dodger blocks to straighten the top plate

members of truss

common trusses
gable end truss

pre-nail the position of the purlin

fix the main hole

Monday, 13 June 2011

WEEK12 SCAFFLODING





access for lifting the roof frames
assembl the sheld



loading the roof frames
roos frames

Tuesday, 7 June 2011

WEEK 11 Pre-nailing the wall framing

wall braces


use the nogs flush and stabilize the fram to boardary joists
position of nailing were above the joists
when cutting the bottom fram timber of the doors,using the sprirt level check if were stright
making the framing
how to making and fixing BLI straps
marking the position of the BLI
using the router to trim out for fixing BLI
trim out for matching the BLI
check the plumb of  the framing with plumb bob
set out the scaffold

Sunday, 29 May 2011

WEEK10 START TO FIX WALL FRAMING

We started to fix the wall framing last Friday.
unload the wall framing
the first framing started  from the corner
check the square and plumb
wall  framing bracing

the bracing 
after check and adjust the flush to boundary joists, the square of the corners and plumb of the wall framing,we fix the braces to reinforce the wall framing.

WEEK10 FINISHED THE FLOORING

Today we finished the Unitec house flooring, I was very happy!
trimed the edge of the sheets
fixed the plywood
the flooring was well done

Sunday, 22 May 2011

WEEK 9 FLOORING

We used perforated aluminum foil laid on the Unitec house before finished the nogs that supported the wall framing.
the nogs for bathroom wall framing

                                                                the nogs for rooms
                                                                                 foil
the foil and the tool for having a sag of 100mm

               we choose sheet flooring to lay on the Unitec house. The size of sheet is 120mmx360mm.used Particleboard for dry area and used Plyboard for wet area. We laid on the sheets from the centre of the floor outwards for areas first for prevented not to be distortion or be broken, and fixed sheet material with 60x2.8mm H.D galv. Nails at 150mm cross around sheet and 300mm cross to intermediate supports.