Tuesday 7 June 2011

WEEK 11 Pre-nailing the wall framing

wall braces


use the nogs flush and stabilize the fram to boardary joists
position of nailing were above the joists
when cutting the bottom fram timber of the doors,using the sprirt level check if were stright
making the framing
how to making and fixing BLI straps
marking the position of the BLI
using the router to trim out for fixing BLI
trim out for matching the BLI
check the plumb of  the framing with plumb bob
set out the scaffold

No comments:

Post a Comment