Sunday, 8 May 2011

WEEEK7 Subfloor Joists

we use the string line to check if the bearers are straight first and then adjust.Measureing the joists and cut to size.Connecting the joisting on the bearers with nails.
plan about joists

string line in the middle of bearer
if the gap between the string line with the bearer are equal
adjust the bearers and make sure the every joists length are same
notice the different color of the joists
the pink joists are  used under normal floor,it is H1.2. the brown joists are used under bathroom  and kitchen place, it is H3.2.

No comments:

Post a Comment