WEEK 20 Start fixing the weatherboards
Tuesday, 23 August 2011
WEEK 19 SEALING THE WINDOW
window jumb over 10mm out of wall framing
head flushing ,vermin strip,Alu-band
set building wrap cover over the Alu-band(vermin strip)
building wrap covered
completed
Monday, 15 August 2011
WEEK18 STAINING THE WEATHERBOARDS
cavity batten on top
cavity batten at bottom
cavity batten finished
staining the weatherboards
hahaha hard work
how to install the weatherboards
Monday, 8 August 2011
17 WEEK SEAL THE WINDOW AND INSTALL THE CAVITY BATTEN
seal the windows
seal the windows
seal the window and the door
the cavitiy batten joint at corner
install the cavity batten at the doors
install cavity batten at the windows
cavity batten
cover with the flushings at every corners
the flushings at the bottom for installing the cavity battens
16 WEEK WRAPPING BUILDING PAPER
wrapped building paper
wrapped the building paper
prepare for painting weatherboard
soffit
15 WEEK GUTER AND ROOFING