Tuesday, 23 August 2011

WEEK 19 SEALING THE WINDOW

window jumb over 10mm out of wall framing

head flushing ,vermin strip,Alu-band

set building wrap cover over the Alu-band(vermin strip)

building wrap covered

completed

Monday, 15 August 2011

WEEK18 STAINING THE WEATHERBOARDS

cavity batten on top

cavity batten at bottom

cavity batten finished

staining the weatherboards

hahaha hard work

how to install the weatherboards

Monday, 8 August 2011

17 WEEK SEAL THE WINDOW AND INSTALL THE CAVITY BATTEN


seal the windows
seal the windows
seal the window and the door




the cavitiy batten joint at corner



install the cavity batten at the doors
install cavity batten at the windows
cavity batten
cover with the flushings at  every corners
the flushings at the bottom for installing the cavity battens

16 WEEK WRAPPING BUILDING PAPER

wrapped building paper

wrapped the building paper

prepare for painting weatherboard


soffit

15 WEEK GUTER AND ROOFING