Tuesday, 28 June 2011

WEEK 14 ROOF FRAME BRACING

Z Nail

strap nail

[ nail

[ nail

diagonal strap brace

CT-200 bracing

uplift strap over lintel

Tuesday, 21 June 2011

WEEK 13 ROOF FRAMING

double top plate jion

 Use a string line and dodger blocks to straighten the top plate

members of truss

common trusses
gable end truss

pre-nail the position of the purlin

fix the main hole

Monday, 13 June 2011

WEEK12 SCAFFLODING





access for lifting the roof frames
assembl the sheld



loading the roof frames
roos frames

Tuesday, 7 June 2011

WEEK 11 Pre-nailing the wall framing

wall braces


use the nogs flush and stabilize the fram to boardary joists
position of nailing were above the joists
when cutting the bottom fram timber of the doors,using the sprirt level check if were stright
making the framing
how to making and fixing BLI straps
marking the position of the BLI
using the router to trim out for fixing BLI
trim out for matching the BLI
check the plumb of  the framing with plumb bob
set out the scaffold